1531 N DEARBORN PKWY, Near North Side
This permit details significant mechanical work at 1531 N Dearborn Pkwy in Chicago's Near North Side, involving hydronic and gas piping extension and reconfiguration. The project also includes the repair or replacement of a Lochinvar FTX1000N boiler system.
The reported cost for this extensive mechanical project is $742,833, issued on May 22, 2026, with an active status. Hill Mechanical Corporation is the contractor for this substantial undertaking, which affects a non-residential unit and the basement mechanical room.
Major mechanical upgrades, including boiler replacement and extensive piping work in the Near North Side, can cost upwards of $742,000.
Issued
May 22, 2026
Expires
—
License
—
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by HILL MECHANICAL CORPORATION · 5 permits across 4 areas
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | B200469313 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Mechanical Work |
| Status | ACTIVE |
| Job Description | HYDRONIC PIPING EXTENSION/RECONFIGURATION, GAS PIPING EXTENSION/RECONFIGURATION, REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 6 BOILER - HOT WATER(LOCHINVAR FTX1000N) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), BASEMENT MECHANICAL ROOM. |
| Floor / Unit | — |
| Estimated Cost | $742,833 |
| Approved | May 5, 2026 |
| Issued |
LATIN SCHOOL OF CHICAGO
| May 22, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |