Skip to content
TelecommunicationsPort of Los AngelesPermit issued

Antenna Upgrade at 740 E Terminal Way, Port of Los Angeles

740 E TERMINAL WAY, Port of Los Angeles, 90731

Winston

Sinra's conciergeOnline now

Planning telecommunications work near Port of Los Angeles? I’ll scope it, price it, and line up the right pro.

Reported project cost

$60,000

As declared on the permit filing. Nonbldg-Alter/Repair.

Issued
June 11, 2026
Expires
—
License
B

What was permitted

This permit details significant work on antenna and equipment levels at a commercial property in the Port of Los Angeles. The project involves removing existing antennas, relocating equipment, and installing new panel antennas and baseband units.

Issued on June 11, 2026, the estimated project cost for this telecommunications upgrade is $60,000. This is classified as a non-building alteration and repair.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Port of Los Angeles, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number25020-10000-02540
Work permit #—
Job filing number—
Work typeNonbldg-Alter/Repair
StatusIssued
Job descriptionANTENNA LEVEL: REMOVE (3) (E) 8' PANEL ANTENNAS ON POS. 2. (1 PER SECTOR) RELOCATE (3) (E) RRUS-4478 B14 FROM POS. 2 TO POS. 4. (1 PER SECTOR) INSTALL (6) (N) 8' PANEL ANTENNA ON POS. 1 AND POS. 4 (2 PER SECTOR) INSTALL (3) (N) AIR 6419 N77G ANTENNAS ON POS. 2. (ABOVE) (1 PER SECTOR) INSTALL (3) (N) AIR 6449 N77D ANTENNAS ON POS. 2. (BELOW) (1 PER SECTOR) INSTALL (3) (N) RRUS 4449 B5/B12 BEHIND POS. 1 (1 PER SECTOR) INSTALL (3) (N) RRUS 8843 B2/B12 BEHIND POS. 1 (1 PER SECTOR) INSTALL (3) (N) POWER TRUNKS AND (1) (N) FIBER TRUNK. FOLLOW EXISTING CABLE ROUTE EQUIPMENT LEVEL: INSTALL (1) (N) XMU UNIT INSIDE (E) PURCELL CABINET. INSTALL (1) (N) 6630 BASEBAND UNIT INSIDE (E) PURCELL CABINET.INSTALL (1) (N) 6648 BASEBAND UNIT INSIDE (E) PURCELL CABINET. INSTALL (2) (N) DC12 SURGE SUPPRESSION UNIT ON (E) H-FRAME.
Floor / unit—
Estimated cost$60,000
ApprovedDecember 4, 2025
IssuedJune 11, 2026
Expires—
BBL—
BIN—

Related searches

antenna installationtelecommunicationsequipment upgradePort of Los AngelescommercialLos Angelesalteration$60,000