Antenna Upgrade at 740 E Terminal Way, Port of Los Angeles
740 E TERMINAL WAY, Port of Los Angeles, 90731
What was permitted
This permit details significant work on antenna and equipment levels at a commercial property in the Port of Los Angeles. The project involves removing existing antennas, relocating equipment, and installing new panel antennas and baseband units.
Issued on June 11, 2026, the estimated project cost for this telecommunications upgrade is $60,000. This is classified as a non-building alteration and repair.
Businesses in the Port of Los Angeles can expect a $60,000 project cost for extensive antenna and telecommunications equipment upgrades.
What it cost
Issued
June 11, 2026
Expires
—
License
B
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Infraservices Group Wireless Llc · 5 permits across 5 areas
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 25020-10000-02540 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Nonbldg-Alter/Repair |
| Status | Issued |
| Job Description | ANTENNA LEVEL: REMOVE (3) (E) 8' PANEL ANTENNAS ON POS. 2. (1 PER SECTOR) RELOCATE (3) (E) RRUS-4478 B14 FROM POS. 2 TO POS. 4. (1 PER SECTOR) INSTALL (6) (N) 8' PANEL ANTENNA ON POS. 1 AND POS. 4 (2 PER SECTOR) INSTALL (3) (N) AIR 6419 N77G ANTENNAS ON POS. 2. (ABOVE) (1 PER SECTOR) INSTALL (3) (N) AIR 6449 N77D ANTENNAS ON POS. 2. (BELOW) (1 PER SECTOR) INSTALL (3) (N) RRUS 4449 B5/B12 BEHIND POS. 1 (1 PER SECTOR) INSTALL (3) (N) RRUS 8843 B2/B12 BEHIND POS. 1 (1 PER SECTOR) INSTALL (3) (N) POWER TRUNKS AND (1) (N) FIBER TRUNK. FOLLOW EXISTING CABLE ROUTE EQUIPMENT LEVEL: INSTALL (1) (N) XMU UNIT INSIDE (E) PURCELL CABINET. INSTALL (1) (N) 6630 BASEBAND UNIT INSIDE (E) PURCELL CABINET.INSTALL (1) (N) 6648 BASEBAND UNIT INSIDE (E) PURCELL CABINET. INSTALL (2) (N) DC12 SURGE SUPPRESSION UNIT ON (E) H-FRAME. |
| Floor / Unit | — |
| Estimated Cost | $60,000 |
| Approved | December 4, 2025 |
| Issued | June 11, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |