Skip to content
General ConstructionBrentwood - Pacific PalisadesPermit issued

Slope Stabilization Project at 587 N East Channel Road, Brentwood - Pacific Palisades

587 N EAST CHANNEL ROAD, Brentwood - Pacific Palisades, 90402

Winston

Sinra's conciergeOnline now

Planning general construction work near Brentwood - Pacific Palisades? I’ll scope it, price it, and line up the right pro.

Reported project cost

$200,000

As declared on the permit filing. Nonbldg-New.

Issued
May 12, 2026
Expires
—
License
B

What was permitted

A significant slope stabilization project is underway at 587 N East Channel Road in the Brentwood - Pacific Palisades neighborhood. This work involves the installation of soil nails and wire rope netting to secure a large slope, addressing near-vertical gradients.

This permit has been issued, with work commencing on May 12, 2026, and an estimated project cost of $200,000. The contractor is listed as unknown for this type of residential dwelling project.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Brentwood - Pacific Palisades, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number26030-10000-00501
Work permit #—
Job filing number—
Work typeNonbldg-New
StatusIssued
Job descriptionProposed stabilization of site slopes with soil nails and wire rope netting on a slope approximately 130 feet in height, with sections approaching near-vertical gradients. The overall slope gradient is approximately 38 degrees.
Floor / unit—
Estimated cost$200,000
ApprovedJanuary 22, 2026
IssuedMay 12, 2026
Expires—
BBL—
BIN—

Related searches

slope stabilization Brentwood - Pacific PalisadesLos Angelesnon-building new$200,000 project cost