Plumbing work at 100 West 77 Street, Manhattan
100 WEST 77 STREET, MANHATTAN, 10024 · Upper West Side (Central)
Estimated Project Cost
$0
Plumbing
Issued
March 26, 2026
Expires
July 13, 2026
License
Master Plumber
About This Project
A significant plumbing permit has been issued for the property located at 100 WEST 77 STREET MANHATTAN. The approved work includes the removal and replacement of roof drains and associated storm piping, re-flashing of vent stacks on the roof, and the installation of new drainage storm piping in the basement. Additionally, the project involves replacing existing hot water heaters with energy-efficient heat pumps and associated water piping, alongside the removal and capping of a gas branch.
This permit, tracking number 179568144, was issued on March 26, 2026, and is set to expire on July 13, 2026. The estimated cost for this extensive plumbing project is $350,000, indicating a substantial upgrade to the building's plumbing and heating infrastructure across the basement, sub-basement, floors 1-3, and roof.
The work is being carried out by FRANCO BELLI PLMG&HTG SON (P), a licensed contractor specializing in plumbing and heating services. This ensures that all work adheres to NYC building codes and standards, providing a professional and compliant execution of the project for property owner NYCSCA.
What This Means For You
This permit signifies major plumbing upgrades, including a shift to heat pumps, which could enhance energy efficiency and modernize the building's systems. Nearby residents might observe increased activity related to the roof and basement work during the project's duration.
The Business That Did This Work
FRANCO BELLI PLMG&HTG SON
Master Plumber · License #002083
165 SECOND AVENUE
4 permits filed · 4 neighborhoods
Permit Details
| Tracking Number | 179568144 |
| Work Permit # | M00672512-S2-PL |
| Job Filing Number | — |
| Work Type | Plumbing |
| Status | Permit Issued |
| Job Description | Remove and replace roof drains & assoc. storm piping & Reflash vent stacks on the roof. Installation of new drainage storm piping in the Basement. Replace existing hot water heaters with heat pumps & associated water piping. Remove gas branch & cap. |
| Floor / Unit | Basement/Sub-basement, Floor Number(s) 001 through 003, Roof |
| Estimated Cost | $350,000 |
| Approved | April 20, 2022 |
| Issued | March 26, 2026 |
| Expires | July 13, 2026 |
| BBL | — |
| BIN | — |
Property Owner
NYCSCA
GORDON TUNG
Related Searches
For Homeowners
Compare Pricing
See how this project's cost compares to similar work in your neighborhood.
Compare PricesFor Homeowners
Hire This Business
Interested in similar work? Get connected with the contractor who filed this permit.
For Businesses
Is This Your Work?
Claim this project page to showcase your pricing and attract new clients.