What was permitted
Significant plumbing work is underway on Staten Island, involving the removal and replacement of fire water service piping. This project also includes the addition of secondary backflow prevention, meter assemblies, and modifications to cold water and sanitary drainage systems.
The permit for this extensive plumbing work was issued on September 10, 2026, with an estimated project cost of $505,988.58. Capital Contr P&H Corp is handling the plumbing and heating aspects of this project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Staten Island, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 786609301 |
|---|---|
| Work permit # | S01085110-I1-PL |
| Job filing number | — |
| Work type | Plumbing |
| Status | Permit Issued |
| Job description | Remove existing fire water service point of entry piping and provide new secondary backflow prevention and meter assemblies. Modify local branch cold water piping and sanitary drainage. Provide sprinkler coverage in missing spaces within existing building |
| Floor / unit | Floor Number(s) 001 through 003 |
| Estimated cost | $505,989 |
| Approved | April 4, 2025 |
| Issued | September 10, 2026 |
| Expires | October 31, 2026 |
| BBL | — |
| BIN | — |
Property owner
Northwell Health (siuh)
Paul Hansen