What was permitted
This extensive plumbing project involves the removal of existing storm piping and the installation of a new underground storm drainage system, including a storm retention system. This upgrade is designed to improve water management and prevent flooding.
The permit was issued on August 19, 2026, with a substantial estimated project cost of $633,000 for the work at 750 Baychester Avenue in the Bronx. MAR-SAL PLBG & HTG, INC is the plumbing contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Bronx, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 310722689 |
|---|---|
| Work permit # | X00955827-S4-PL |
| Job filing number | — |
| Work type | Plumbing |
| Status | Permit Issued |
| Job description | X456 : Removal of all Existing Storm Piping & install 12 HDP Storm Subterrain System below the Turf Field. Trench Drain inside the Perimeter of tracks which is conveyed to (1) Storm Retention System with 96 Sections each is 7'-2 Sections. ACP-5 Provided |
| Floor / unit | Open Space |
| Estimated cost | $633,000 |
| Approved | March 22, 2024 |
| Issued | August 19, 2026 |
| Expires | September 12, 2026 |