What was permitted
For residents in Co-op City, this permit provides a look at the significant costs involved in large-scale underground plumbing projects. The work at 750 Baychester Avenue includes the removal and installation of a new storm piping system beneath a turf field.
This extensive plumbing project was permitted on September 8, 2026, with a substantial estimated cost of $633,000. MAR-SAL PLBG & HTG, INC is the contractor responsible for this storm retention system installation.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Bronx, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 399423792 |
|---|---|
| Work permit # | X00955827-S4-PL |
| Job filing number | — |
| Work type | Plumbing |
| Status | Permit Issued |
| Job description | X456 : Removal of all Existing Storm Piping & install 12 HDP Storm Subterrain System below the Turf Field. Trench Drain inside the Perimeter of tracks which is conveyed to (1) Storm Retention System with 96 Sections each is 7'-2 Sections. ACP-5 Provided |
| Floor / unit | Open Space |
| Estimated cost | $633,000 |
| Approved | March 22, 2024 |
| Issued | September 8, 2026 |
| Expires | August 21, 2027 |
| BBL | — |
| BIN | — |