Irrigation System Installation at 8701 Dawnridge Cir, Austin
8701 DAWNRIDGE CIR, 78757
What was permitted
A new residential irrigation system is being installed in the front yard of this Austin home. The project involves a 6-zone setup, including specialized dripper zones for garden beds and MP rotator zones for grass areas, ensuring efficient watering.
This plumbing permit is active and was issued on June 1, 2026. While the exact project cost is not listed, such systems can vary significantly based on complexity and materials used. The contractor for this project is currently unknown.
Homeowners considering a new irrigation system can look to this permit for an example of a comprehensive front-yard setup in Austin.
What it cost
Issued
June 1, 2026
Expires
November 28, 2026
License
—
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-066880 PP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Plumbing Permit · Irrigation |
| Status | Active |
| Job Description | Front yard residential irrigation system. 6 zone system including 3 dripper irrigation zones (2 for strips by road 1 for flower bed) and 3 mp rotator grass zones (2 side yard zones and 1 main front yard zone). Master valve isolation valve double check valve assembly rain sensor and rachio control box included in system. Trench depth to be 8 to 10 inches 6 inches of fill on top of pipes. Main line will horseshoe around the house so trenching will be done through the back yard for wiring and mainline. No back yard irrigation zones. 4 inch pop up heads used secured to class 200 3/4 inch lateral line pipe using swing pipe. Mainline to be 1 inch pipe. Purple primer and blue glue used for all connections. |
| Floor / Unit | — |
| Estimated Cost | Not reported |
| Approved | May 27, 2026 |
| Issued | June 1, 2026 |
| Expires | November 28, 2026 |
| BBL | — |
| BIN | — |