What was permitted
A new plumbing permit has been issued for a residential property located at 1606 Niles Rd in Austin. The project involves the construction of a new accessory dwelling unit, specifically a tennis pavilion with a restroom.
This plumbing permit is active and was issued on September 11, 2026. The work is being performed by plumbing contractor Fox & Hearn, Inc. The cost for this type of new construction plumbing can vary significantly based on fixtures and complexity.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Old enfield, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-055411 PP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Plumbing Permit · New |
| Status | Active |
| Job description | REV 3 ePlan: Residential Expedited Review - New Accessory to Primary [0bed 1bath] - Tennis Pavilion Restroom Detached Covered Patio at Tennis Pavilion. REVISION #1 INCLUDES: 1. The overall footprint first and 2nd floor of the Guest House increased by 404 SF. 2. Canopy length located east of the Guest House increased by 40 SF from 40-0 to 42-8. Depth remains the same. 3. New canopy added to southwest side of the Guest House at 39 SF. 4. Backup battery enclosure located on the south of Guest House was removed. 5. New Mech. enclosure with previous backup battery has been re-located northwest of Guest House. 6. On second floor windows F200.1 and F200.2 in Hall F200 have been removed. 7. All green roofs at the Guest House have been removed. 8. Mechanical enclosure includes an acoustical CMU. Civil and structural drawings have been updated to reflect the changes above. 9. Tennis Pavilion was reduced from (59-8x14) to (37-9x14). 10. The roof is a standing seam roof with gutters around the pavilion. 11. Shielded tennis court downlights with light poles were added. 12. Civil and structural drawings have been updated to reflect the changes above. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | December 13, 2022 |
| Issued | September 11, 2026 |
| Expires | March 29, 2027 |
| BBL | — |
| BIN | — |
Related searches