What was permitted
This permit covers significant infrastructure work at an airport, involving the installation of structural towers and associated mechanical systems for a camera surveillance system. While not a typical home project, it illustrates complex installations involving plumbing and electrical components.
The permit was issued on June 17, 2026, and is active. 5F Mechanical Co. is the plumbing contractor responsible for the mechanical aspects of this project at 3600 Presidential Blvd.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-066212 PP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Plumbing Permit · Remodel |
| Status | Final |
| Job description | Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructure (electrical =mechanical) for powering and maintaining camera systems. [Airside Permits] |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | March 30, 2026 |
| Issued | June 17, 2026 |
| Expires | September 15, 2026 |
| BBL | — |
| BIN | — |
Related searches