What was permitted
Homeowners in Austin can review this permit for a significant plumbing project involving the replacement of compromised kitchen and laundry drain lines beneath the foundation at 2306 Ventura Dr.
This permit was issued on September 16, 2026, and is active, with Beyond Wow Plumbing as the contractor. The project involves tunneling approximately 35 feet to replace old cast iron piping with new PVC, and the cost is not specified.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Parker lane, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-118955 PP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Plumbing Permit · Repair |
| Status | Final |
| Job description | Replace the compromised kitchen drain laundry drain and associated building drain through an approximately 35-foot tunnel beneath the foundation. The tunnel will extend from the existing cleanout on the left side of the home toward the kitchen and laundry area ending at the washing machine drain connection. Existing cast iron piping and branch drain lines will be removed and replaced with new Schedule 40 PVC drainage piping. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | September 10, 2026 |
| Issued | September 16, 2026 |
| Expires | September 28, 2026 |
| BBL | — |
| BIN | — |
Related searches