What was permitted
This plumbing permit is for the installation of new above-ground LP (propane) gas piping to supply commercial roasting equipment. This type of work is common for businesses with specialized appliances and helps understand the infrastructure costs involved.
The permit was issued on November 1, 2026, and is active. Lalos Plumbing is the plumbing contractor responsible for this new piping installation.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-132862 PP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Plumbing Permit · Repair |
| Status | Active |
| Job description | Bldg 3 Unit 370- NEW ABOVE-GROUND LP (PROPANE) GAS PIPING INSTALLATION COMMERCIAL ROASTING EQUIPMENT. This is a standalone new-work trade permit (gas piping) NOT a repair permit. No existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. PURPOSE: Install new above-ground LP gas piping to supply a commercial coffee roaster (IMF RM-15A_STD manufacturer data sheet Doc ST_00) inside the modular building at this address. Piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. The exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. Contractor scope ends at the exterior stub; it does NOT include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. WORK DIMENSIONS: Total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. Pipe size: 3/4 in nominal Schedule 40 black steel trunk line reduced to 1/2 in NPT at the roasters gas train connection. Scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. No underground piping by the applicant. APPLIANCE DIMENSIONS AND SPECS (IMF RM-15A_STD data sheet): Overall dimensions 87.16 in L x 41.73 in W x 76.45 in H; weight 1433 lb (650 kg); burner Riello Gulliver BS1F LPG; maximum thermal input 178000 BTU/hr; LPG consumption 8.4 lb/hr; required inlet pressure minimum 12 in WC maximum 48 in WC; gas train connection 1/2 in; c |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | October 8, 2026 |
| Issued | November 1, 2026 |
| Expires | April 30, 2027 |
| BBL | — |
| BIN | — |