Plumbing Repair at 2511 W Parmer Ln, Austin
2511 W PARMER LN, 78758
What was permitted
This plumbing permit details a significant repair to the sanitary sewer system at 2511 W Parmer Ln, requiring a hand tunnel and replacement of approximately 4050 linear feet of existing building drain. This project offers a look at the scope and potential costs of major underground plumbing work.
Issued on July 15, 2026, this permit is active. M3 Plumbing Services is the plumbing contractor undertaking the removal and replacement of PVC piping and tie-ins to the existing sewer system.
Extensive sanitary sewer line replacement was permitted, highlighting the significant costs associated with major underground plumbing repairs for commercial properties.
What it cost
Issued
July 15, 2026
Expires
January 11, 2027
License
Plumbing Contractor
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by M3 Plumbing Services
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-090778 PP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Plumbing Permit · Repair |
| Status | Active |
| Job Description | Hand tunnel beneath the existing commercial building to access the sanitary sewer system. Remove and replace approximately 4050 linear feet of existing building drain from the failed section outside the building to the existing double cleanout. Install new PVC building drain main and branch lines to tie back into existing fixtures below including required transition from existing 6-inch piping to 4-inch piping where applicable. Complete tie-in at the existing double cleanout test the new sewer line and backfill excavations upon completion. All work to comply with the current City of Austin Plumbing Code and applicable permitting requirements. |
| Floor / Unit | — |
| Estimated Cost | Not reported |
| Approved | July 14, 2026 |
| Issued | July 15, 2026 |
| Expires | January 11, 2027 |