2805 BLAKE ST, 78748
This plumbing permit details significant drain system repairs needed for the hall bathroom at 2805 Blake St in Austin. The work involves tunneling beneath the foundation to access and replace damaged sections of the main drain line, addressing multiple leaks and widespread pipe failure.
Issued on June 10, 2026, this permit is for a repair project. While the exact cost is not listed, extensive re-piping and tunneling suggest a substantial investment. Plumbing Outfitters LLC is the listed plumbing contractor for this job.
Homeowners in the 78748 zip code considering drain system repairs should note the scope and potential cost of extensive re-piping and tunneling as seen in this permit.
Issued
June 10, 2026
Expires
December 7, 2026
License
Plumbing Contractor
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by Plumbing Outfitters LLC
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 2026-073128 PP |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Plumbing Permit · Repair |
| Status | Active |
| Job Description | This estimate outlines the scope of work required to address multiple failures in the drain system servicing the hall bathroom. Upon return Centex will perform approximately 25 feet of tunneling beneath the foundation to gain access to the damaged section of the 3 main drain line serving the hall bathroom. During initial evaluation multiple leaks were identified including two leaks on the main line and two additional leaks at the lavatory and tub drain connections indicating widespread failure of the existing drainage system. Due to the condition of the piping the recommended course of action is to fully re-pipe the hall bathroom drain system rather than attempt isolated repairs. This will ensure long-term reliability and bring the system up to current standards. All necessary piping within the hall bathroom area will be fully exposed and replaced including connections to the lavatory and tub drains as well as the affected section of the main line. Once all repairs and re-piping are completed we will: Perform a full system test to verify proper function and confirm there are no remaining leaks Coordinate and schedule required city inspection to ensure compliance with local plumbing codes |
| Floor / Unit | — |
| Estimated Cost | Not reported |
| Approved | June 9, 2026 |
| Issued | June 10, 2026 |
| Expires | December 7, 2026 |
| BBL | — |
| BIN | — |