What was permitted
A significant plumbing repair project is underway at a property on HILLBROOK CIR in Austin, involving the replacement of all cast iron pipes above and below the slab. This extensive work includes tunneling and the installation of new drain, sewer, and main water lines.
The permit for this repair was issued on October 16, 2026, by Plumb Papi. While the project scope is substantial, including tunneling and replacing the main water line with PVC and a tankless water heater, the estimated project cost is not available.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-134089 PP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Plumbing Permit · Repair |
| Status | Active |
| Job description | Replacing all cast iron above and below the slab. We will be cutting interior wall to remove all cast iron. Tunneling 65 linear feet. 3 access holes. One front of home and 2 in back of home. Using sch 40 pvc for all drain and sewer work. No cutting or removal of concrete. Replacing the main water line. Installing a tankless water heater. |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | October 12, 2026 |
| Issued | October 16, 2026 |
| Expires | April 14, 2027 |
| BBL | — |
| BIN | — |