What was permitted
A plumbing repair permit has been issued for a property on E APPLEGATE DR in Austin, specifically addressing an issue with the water line at the kitchen sink. The work involves capping the existing 3/4 water line before it enters the foundation.
This permit, issued on May 7, 2026, is currently active. Plumbing Outfitters LLC is the plumbing contractor undertaking this repair.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Windsor hills, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-053120 PP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Plumbing Permit · Repair |
| Status | Active |
| Job description | The 3/4 water line at the kitchen sink will be capped before it goes into the foundation. We will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. This will eliminate the hot water system under the foundation |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | April 29, 2026 |
| Issued | May 7, 2026 |
| Expires | November 4, 2026 |
| BBL | — |
| BIN | — |
Related searches