What was permitted
Significant plumbing work is underway at 909 E 2nd St in Austin, addressing major issues with the home's main sewer lines, which are a combination of cast-iron and PVC. The repair requires trenching approximately 100 feet from the cleanout to the city tap and a 7-foot tunnel under the home.
This plumbing repair permit is active and was issued on July 9, 2026. The work involves exposing and re-piping a downstairs bathroom's branch lines to the main line, with NEW ABACUS, LLC serving as the plumbing contractor.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in East cesar chavez, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 2026-085519 PP |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Plumbing Permit · Repair |
| Status | Final |
| Job description | .Ran camera down left side of home encountered three major bellies two disconnected main lines because of a combination of cast-iron and PVC house was built in the 50s or 60s In order to accomplish this repair we must trench from the clean out to the city tap going towards the backyard in a straight line about 100 feet then going underneath the home. We need to do a 7 foot tunnel even though the home is on pure and Beam where the cleanout is is underground and then pops up to the first downstairs bathroom we need to expose that bathroom shower sink and toilet and re-pipe those branch lines to the main line |
| Floor / unit | — |
| Estimated cost | Not reported |
| Approved | July 3, 2026 |
| Issued | July 9, 2026 |
| Expires | August 3, 2026 |