Skip to content
Protection and Mechanical MethodsManhattanPermit issued

Protection and Mechanical Methods at 1011 First Avenue, Manhattan

1011 FIRST AVENUE, Manhattan, 10022 · East Midtown-Turtle Bay

Winston

Sinra's conciergeOnline now

Planning protection and mechanical methods work near East Midtown-Turtle Bay? I’ll scope it, price it, and line up the right pro.

Reported project cost

$20,400

As declared on the permit filing. Protection and Mechanical Methods.

Issued
September 29, 2026
Expires
April 1, 2027
License
General Contractor

What was permitted

This permit covers the installation of dual personnel hoist cars at 1011 First Avenue in Manhattan, a crucial element for construction site safety and logistics. The installation must adhere to specific code requirements for safety during building operations.

The estimated cost for this protection and mechanical methods project is $20,400, with the permit issued on September 29, 2026. ARSENAL SCAFFOLD INC is the contractor for this specialized installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number964944004
Work permit #M01276322-I1-PMM
Job filing number—
Work typeProtection and Mechanical Methods
StatusPermit Issued
Job descriptionINSTALLATION OF 7,000 LB DUAL PERSONNEL HOIST CARS @ NORTH AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Floor / unitOpen Space
Estimated cost$20,400
ApprovedOctober 1, 2025
IssuedSeptember 29, 2026
ExpiresApril 1, 2027
BBL—
BIN—

Property owner

X11 First Ave LLC

Joseph Chilelli

Related searches

protection and mechanical methodsmanhattaneast midtownpersonnel hoistconstruction safetysite logistics$20,400 project