What was permitted
A permit has been issued for the installation of a temporary single personnel hoist at 114 Bruckner Boulevard in the Mott Haven-Port Morris neighborhood of the Bronx. This equipment is typically used to transport workers and materials safely on larger construction sites.
The permit was issued on July 29, 2026, by CS BRIDGE CORP. The description notes that the work must comply with 2022 building codes and does not involve any change in the building's use, egress, or occupancy.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Bronx, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 766948321 |
|---|---|
| Work permit # | X01294705-Z1-PMM |
| Job filing number | — |
| Work type | Protection and Mechanical Methods |
| Status | Permit Issued |
| Job description | Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application. |
| Floor / unit | Floor Number(s) 1 through 14, Roof |
| Estimated cost | Not reported |
| Approved | July 29, 2026 |
| Issued | July 29, 2026 |
| Expires | April 1, 2027 |
| BBL | — |
| BIN | — |
Property owner
Rubin Equities INC
Sam Rubin
Related searches