Temporary Material Hoist Installation at 2 Lexington Avenue, Manhattan
2 LEXINGTON AVENUE, MANHATTAN, 10010 · Gramercy
What was permitted
For those in the Gramercy neighborhood curious about construction logistics, this permit details the installation of a temporary material hoist. This equipment is crucial for moving materials to higher floors during building work.
The permit for this temporary material hoist was issued on June 22, 2026, with an estimated project cost of $1,000. SPRING SCAFFOLDING LLC is the General Contractor for this installation.
A temporary material hoist installation at 2 Lexington Avenue, Gramercy, has an estimated project cost of $1,000.
What it cost
Issued
June 22, 2026
Expires
March 1, 2027
License
General Contractor
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by SPRING SCAFFOLDING LLC · 446 permits across 62 neighborhoods
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 206097606 |
| Work Permit # | M01238798-I1-PMM |
| Job Filing Number | — |
| Work Type | Protection and Mechanical Methods |
| Status | Permit Issued |
| Job Description | INSTALLATION OF TEMPORARY MATERIAL HOIST AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE MATERAIL HOIST AT THE LEXINGTON AVENUE (FRONT) ELEVATION FROM THE TOP OF THE SIDEWALK BRIDGE TO THE TOP OF THE BUILDING INCLUDING THE MAIN ROOF. |
| Floor / Unit | Open Space |
| Estimated Cost | $1,000 |
| Approved | June 24, 2025 |
| Issued | June 22, 2026 |
| Expires | March 1, 2027 |
| BBL | — |
| BIN | — |
Property Owner
MCR Hotels
Pete Foster