Temporary Roof Protection at 245 West 55th Street, Manhattan
245 WEST 55 STREET, MANHATTAN, 10019 · Midtown-Times Square
What was permitted
A temporary roof protection and engineering enclosure system is being installed at 245 West 55th Street in the Midtown-Times Square area. This is often done to protect adjacent properties during construction or repair work.
The permit for this project was issued on June 16, 2026, with an estimated cost of $18,000. ARSENAL SCAFFOLD INC (GC) is the contractor, and the work adheres to Chapter 33 of the 2022 building code.
Expect to see protective engineering enclosures around buildings in Midtown-Times Square, with this project costing $18,000 to safeguard neighboring properties.
What it cost
Issued
June 16, 2026
Expires
April 1, 2027
License
General Contractor
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by ARSENAL SCAFFOLD INC · 215 permits across 49 neighborhoods
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | 507729894 |
| Work Permit # | M01083449-I1-PMM |
| Job Filing Number | — |
| Work Type | Protection and Mechanical Methods |
| Status | Permit Issued |
| Job Description | INSTALLATION OF TEMPORARY ROOF PROTECTION OVER ADJACENT PROPERTIES, AND ENGINEERING ENCLOSURE SYSTEM AS PER PLANS. PROTECTION SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO |
| Floor / Unit | Roof |
| Estimated Cost | $18,000 |
| Approved | July 23, 2024 |
| Issued | June 16, 2026 |
| Expires | April 1, 2027 |
| BBL | — |
| BIN | — |
Property Owner
MADIGAN DEVELOPMENT, LLC
Louis Madigan