What was permitted
A temporary Site Specific Engineered Enclosure System is being installed at 260 East 72 Street on the Upper East Side of Manhattan. This system is designed to ensure safety and compliance with building codes during construction or repair activities.
Issued on May 28, 2026, the estimated project cost for this enclosure is $3,000. COLGATE ENTERPRISE CORP is the contractor responsible for this installation.