What was permitted
This permit addresses critical structural work, specifically the temporary shoring of a deteriorated slab at George Washington High School in Manhattan's Washington Heights (North) neighborhood. This is a safety-focused project to stabilize the existing structure.
The estimated cost for this protection and mechanical methods work is $20,000, with KEL-TECH CONSTRUCTION INC as the general contractor. Issued on May 21, 2026, this provides a cost reference for essential structural stabilization projects.