What was permitted
Temporary scaffolding is being erected at 63 E Lake St in Chicago's Loop neighborhood, covering all elevations. This extensive setup includes three units with a maximum length of 120 feet and a maximum height of 240 feet.
This permit was issued on August 26, 2026, and is valid for 365 days. While the permit fee was $475, the overall project cost for such large-scale scaffolding can vary significantly depending on the duration and the nature of the work it supports.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Loop, and lines up the right contractor. You approve; we handle the back-and-forth.