929 W FOSTER AVE, Uptown
Temporary scaffolding has been permitted for installation on the east elevation of the property at 929 W Foster Ave in Chicago's Uptown neighborhood. This setup includes two sections of scaffolding, with a maximum length of 62 feet and a height of 180 feet.
The permit for this scaffolding was issued on April 22, 2026, and will remain active for 365 days, indicating an extended period of work or access required. J.S.L BUILDING RESTORATION GROUP INC is the contact for this scaffolding project.
Uptown residents may notice significant scaffolding at 929 W Foster Ave for up to a year, suggesting substantial building restoration or construction work is underway.
Issued
April 22, 2026
Expires
—
License
—
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by J.S.L BUILDING RESTORATION GROUP INC · 4 permits across 3 areas
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | B200467240 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Scaffolding |
| Status | ACTIVE |
| Job Description | TEMPORARY SCAFFOLDING: QTY: 2, MAX. LENGTH: 62 FT., MAX. HEIGHT: 180 FT. LOCATION: EAST ELEVATION. PERMIT EXPIRATION DATE: 365 DAYS FROM PERMIT ISSUED DATE |
| Floor / Unit | — |
| Estimated Cost | Not reported |
| Approved | April 21, 2026 |
| Issued | April 22, 2026 |
ADMIRAL AT THE LAKE
| Expires |
| — |
| BBL | — |
| BIN | — |