What was permitted
This project focuses on installing a solar photovoltaic system on the roof of the principal building, designed for a sloped roof. The system will have an inverter output of 10 KW and an array output of 3.28 KW, complemented by a 15 KWH energy storage system.
With an estimated project cost of $11,232, this solar installation permit was issued on May 11, 2026, and is currently active. SUNRUN INSTALLATION SERVICES is the contractor for this renewable energy upgrade.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in South Deering, and lines up the right contractor. You approve; we handle the back-and-forth.