What was permitted
Residents in the Hermosa neighborhood can explore the costs associated with solar panel installations. This permit covers the installation of solar panels on the roof of the principal building at 2125 N Kostner Ave.
The project, with a reported cost of $37,270, was issued on April 25, 2026, and is currently active. It features a steep roof type, an 11.5 KW inverter, a 10.12 KW array, and a 13.5 KWH energy storage system, handled by NEXT BUILDERS INC DBA AMERICAN ENERGY SYSTEMS INC.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Hermosa, and lines up the right contractor. You approve; we handle the back-and-forth.