What was permitted
A new solar PV system is being installed at 2141 W 52nd St in the New City neighborhood. This project includes installing solar panels on the roof of the principal building, along with a 13.5 kWh energy storage system.
The permit is active and was issued on October 13, 2026, with a reported project cost of $26,375. SUNRUN INSTALLATION SERVICES is the contractor handling the installation of this solar system.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in New City, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200515222 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 11.25 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF PLANES OF HOME. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817. |
| Floor / unit | — |
| Estimated cost | $26,375 |
| Approved | October 8, 2026 |
| Issued | October 13, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Mccoy James
Related searches