What was permitted
Curious about the cost of going solar in Lincoln Park? This permit details the installation of solar panels on the roof of a principal building, along with a 13.5 kWh energy storage system.
Issued on April 21, 2026, this project has an active status. The reported project cost is $37,262, and the installation was handled by KAPITAL ELECTRIC CO., INC.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Lincoln Park, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200465802 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: LOW-SLOPED (<2:12). INVERTER OUTPUT: 11.5 KW. ARRAY OUTPUT: 12.42 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF (PANELS) & BASEMENT (EQUIPMENT) / UNIT 1. ICC DISTRIBUTED GENERATION INSTALLER CERT. #14-0235. |
| Floor / unit | — |
| Estimated cost | $37,262 |
| Approved | April 10, 2026 |
| Issued | April 21, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Bianchi Darren
Related searches