What was permitted
Homeowners in Irving Park considering solar energy can reference this permit for project cost insights. This project involves installing solar panels and a 13.5 kWh energy storage system on the roof of a primary building.
The estimated cost for this solar installation, including the energy storage system, is $62,786, with the permit issued on October 2, 2026, by TRON SOLAR, LLC.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Irving Park, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200510460 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 6.3 KW. ARRAY OUTPUT: 6.3 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF OF PRIMARY STRUCTURE. ICC DISTRIBUTED GENERATION INSTALLER CERT. #19-0736. |
| Floor / unit | — |
| Estimated cost | $62,786 |
| Approved | September 4, 2026 |
| Issued | October 2, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Kane Colin
Related searches