What was permitted
For Chicago homeowners in the Forest Glen area interested in renewable energy, this permit offers a look at the investment in solar power. The project involved installing a solar panel system on the roof of an accessory building, including a 3.96 KW array and a 19.87 KWH energy storage system.
This express permit was issued on August 13, 2026, with a reported project cost of $23,220. SUNRISE SOLAR LLC, holding ICC Distributed Generation Installer Cert. #23-0672, was the contractor for this installation.