What was permitted
Homeowners in Jefferson Park considering renewable energy can explore the details of this solar panel installation project. This project involves installing solar panels on the roof of an accessory building, complete with a 13.5 kWh energy storage system.
This permit for a small-scale solar PV system was issued on October 1, 2026, with a reported project cost of $18,627. The work was performed by TESLA, INC.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Jefferson Park, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200513900 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF ACCESSORY BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OUTPUT: 0.7371 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ALL EQUIPMENT EXTERIOR. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0853. |
| Floor / unit | — |
| Estimated cost | $18,627 |
| Approved | September 30, 2026 |
| Issued | October 1, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Mitchell Laura
Related searches