5822 S CALIFORNIA AVE, Gage Park
Homeowners in Gage Park are exploring renewable energy options, with this permit detailing the installation of a small-scale solar PV system on the roof of an accessory building. The project includes a 10 KW inverter output and a 9.43 KW array, along with a 15 KWH energy storage system, indicating a significant investment in solar power.
This project, with an estimated cost of $17,917, was issued an active permit on June 5, 2026. Sunrun Installation Services is the contractor responsible for this solar panel installation, which is designed for a steep roof type.
A solar panel system with energy storage was permitted for installation on an accessory building in Gage Park for an estimated $17,917.
Issued
June 5, 2026
Expires
—
License
—
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by SUNRUN INSTALLATION SERVICES · 297 permits across 41 areas
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | B200472271 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job Description | INSTALL SOLAR PANELS ON ROOF OF ACCESSORY BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 9.43 KW. INCLUDES 15 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF PLANES OF DETACHED STRUCTURE. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817. |
| Floor / Unit | — |
| Estimated Cost | $17,917 |
| Approved | May 28, 2026 |
| Issued |
ZOQUIAPA JESENIA
| June 5, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |