What was permitted
Homeowners in the Clearing neighborhood considering solar energy can find cost insights. This permit is for installing solar panels on a sloped roof, including a substantial energy storage system.
Issued on October 26, 2026, this solar project has an active status and a reported cost of $13,200. SUNRISE SOLAR LLC is the contact for this installation, which includes a 13.5 kWh energy storage system.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Clearing, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200516254 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OUTPUT: 8.8 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOFTOP. ICC DISTRIBUTED GENERATION INSTALLER CERT. #23-0672. |
| Floor / unit | — |
| Estimated cost | $13,200 |
| Approved | October 20, 2026 |
| Issued | October 26, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Mccarter Issaic
Related searches