What was permitted
Residents in Chicago's Norwood Park neighborhood can examine a renewable energy project at 6013 N ELSTON AVE. This permit covers the installation of solar panels on the sloped roof of the principal building, along with a 20 kWh energy storage system.
Issued on April 29, 2026, this solar installation project has a reported cost of $34,717. The work is being carried out by CELESTAR SOLAR LLC and includes rooftop solar and electrical components.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Norwood Park, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200466273 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 0.38 KW. ARRAY OUTPUT: 0.01672 KW. INCLUDES 20 KWH ENERGY STORAGE SYSTEM. LOCATION: HOUSE ROOFTOP SOLAR AND ELECTRICAL. ICC DISTRIBUTED GENERATION INSTALLER CERT. #20-0678. |
| Floor / unit | — |
| Estimated cost | $34,717 |
| Approved | April 22, 2026 |
| Issued | April 29, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Jardien Robert
Related searches