Skip to content
Solar EnergyGreater Grand CrossingPermit issued

Solar Panel System Installation at 7017 S Stewart Ave, Greater Grand Crossing

7017 S STEWART AVE, Greater Grand Crossing

Winston

Sinra's conciergeOnline now

Planning solar energy work near Greater Grand Crossing? I’ll scope it, price it, and line up the right pro.

Reported project cost

$34,309

As declared on the permit filing. Small-Scale Solar PV System.

Issued
September 30, 2026
Expires
—
License
—

What was permitted

Residents in Greater Grand Crossing can research the investment involved in sustainable energy. This permit details the installation of a solar photovoltaic system on the sloped roof of a principal building, including a significant energy storage system.

The project, issued on September 30, 2026, has an estimated cost of $34,309 and was managed by THE CORTESE ENERGY COMPANY LLC. This active permit signifies a substantial commitment to renewable energy for the property.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Greater Grand Crossing, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking numberB200511138
Work permit #—
Job filing number—
Work typeSmall-Scale Solar PV System
StatusACTIVE
Job descriptionINSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW. ARRAY OUTPUT: 6.75 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF MOUNT SOLAR PANEL INSTALL ON MAIN HOUSE. ICC DISTRIBUTED GENERATION INSTALLER CERT. #24-0676.
Floor / unit—
Estimated cost$34,309
ApprovedSeptember 29, 2026
IssuedSeptember 30, 2026
Expires—
BBL—
BIN—

Property owner

Glenn Benjamin

Related searches

solar panelsGreater Grand CrossingChicagoexpress permit$34,309 project costrenewable energyenergy storage