What was permitted
A significant renewable energy project is underway at 7648 S Hermitage Ave in Auburn Gresham, involving the installation of solar panels on the roof of an accessory building. The system includes a 9.6 KW inverter output and a 2.61 KW array, along with a 19.87 kWh energy storage system.
This express permit program project was issued on April 22, 2026, with a reported cost of $25,448. SUNRISE SOLAR LLC is the contractor for this installation, which is designed for a sloped roof and includes EVSE-ready parking spaces.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Auburn Gresham, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200464319 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF ACCESSORY BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 9.6 KW. ARRAY OUTPUT: 2.61 KW. INCLUDES 19.87 KWH ENERGY STORAGE SYSTEM. LOCATION: GARAGE ROOFTOP. ICC DISTRIBUTED GENERATION INSTALLER CERT. #23-0672. |
| Floor / unit | — |
| Estimated cost | $25,448 |
| Approved | March 31, 2026 |
| Issued | April 22, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Grant Lee
Related searches