Solar Panel and Energy Storage System Installation at 7648 S Hermitage Ave
7648 S HERMITAGE AVE, Auburn Gresham
What was permitted
A significant renewable energy project is underway at 7648 S Hermitage Ave in Auburn Gresham, involving the installation of solar panels on the roof of an accessory building. The system includes a 9.6 KW inverter output and a 2.61 KW array, along with a 19.87 kWh energy storage system.
This express permit program project was issued on April 22, 2026, with a reported cost of $25,448. SUNRISE SOLAR LLC is the contractor for this installation, which is designed for a sloped roof and includes EVSE-ready parking spaces.
Auburn Gresham property owners can reference the $25,448 cost for a solar panel system with a 19.87 kWh energy storage unit, highlighting the investment in sustainable home energy solutions.
What it cost
Issued
April 22, 2026
Expires
—
License
—
Price your own project
See what a project like this costs near you
We'll compare your scope against real permits and licensed contractors in the area.
Start my estimate →Free · takes 60 seconds · no account needed
Filed by SUNRISE SOLAR LLC · 22 permits across 11 areas
View the official permit record
Tracking number, work description, cost, and dates
+
View the official permit record
Tracking number, work description, cost, and dates
| Tracking Number | B200464319 |
| Work Permit # | — |
| Job Filing Number | — |
| Work Type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job Description | INSTALL SOLAR PANELS ON ROOF OF ACCESSORY BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 9.6 KW. ARRAY OUTPUT: 2.61 KW. INCLUDES 19.87 KWH ENERGY STORAGE SYSTEM. LOCATION: GARAGE ROOFTOP. ICC DISTRIBUTED GENERATION INSTALLER CERT. #23-0672. |
| Floor / Unit | — |
| Estimated Cost | $25,448 |
| Approved | March 31, 2026 |
| Issued | April 22, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property Owner
GRANT LEE