What was permitted
A new solar photovoltaic system is being installed on the roof of the main house at 907 E 92ND PL in Chicago's Burnside neighborhood. The system will have an inverter output of 10 KW and an array output of 5.4 KW, including a 13.5 KWH energy storage system.
This permit is active and was issued on August 27, 2026, with a reported project cost of $15,260. Sunrun Installation Services is the contractor for this solar panel project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Burnside, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | B200506886 |
|---|---|
| Work permit # | — |
| Job filing number | — |
| Work type | Small-Scale Solar PV System |
| Status | ACTIVE |
| Job description | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 10 KW. ARRAY OUTPUT: 5.4 KW. INCLUDES 13.5 KWH ENERGY STORAGE SYSTEM. LOCATION: ROOF PLANES OF MAIN HOUSE. ICC DISTRIBUTED GENERATION INSTALLER CERT. #18-0817. |
| Floor / unit | — |
| Estimated cost | $15,260 |
| Approved | August 12, 2026 |
| Issued | August 27, 2026 |
| Expires | — |
| BBL | — |
| BIN | — |
Property owner
Hayes Rodney
Related searches