Temporary StructureNear North SidePermit Issued

Temporary Structure Installation at 401 N Michigan Ave, Chicago

401 N MICHIGAN AVE, Near North Side

1

What was permitted

Homeowners and neighbors in Chicago's Near North Side can see the details of a temporary structure installation permit. This project involves assembling stages and a shipping container, totaling over 500 square feet of temporary space.

This permit was issued on July 20, 2026, and is active. While the permit fee was $325, the actual project cost for this temporary setup is not specified but would depend on rental and assembly expenses.

A temporary structure, including stages and a shipping container, was permitted for installation on N Michigan Ave, offering insight into event or short-term setup costs in the Near North Side.

2

What it cost

Not reportedreported on this filing

Issued

July 20, 2026

Expires

License

3

Price your own project

See what a project like this costs near you

We'll compare your scope against real permits and licensed contractors in the area.

Start my estimate →

Free · takes 60 seconds · no account needed

Filed by SOUTH SIDE COLLECTIONS CORP · 2 permits across 2 areas

View the official permit record

Tracking number, work description, cost, and dates

+
Tracking NumberB200479182
Work Permit #
Job Filing Number
Work TypeSmall Temporary Structure
StatusACTIVE
Job DescriptionTEMPORARY STRUCTURE: NEW INSTALLATION. STAGE/PLATFORM - ASSEMBLY - 324 SQ. FT. SHIPPING CONTAINER - ASSEMBLY - 160 SQ. FT. STAGE/PLATFORM - ASSEMBLY - 16 SQ. FT. STAGE/PLATFORM - ASSEMBLY - 21 SQ. FT. STAGE/PLATFORM - ASSEMBLY - 96 SQ. FT. TRAILER - ASSEMBLY - 261 SQ. FT. ELECTRICAL WORK = NO. NON-SEWER TOILETS: 0. INSTALL DATE: 7/21/2026; REMOVAL DATE: 7/27/2026.
Floor / Unit
Estimated CostNot reported
ApprovedJuly 18, 2026
IssuedJuly 20, 2026
Expires
BBL
BIN

Property Owner

DRAKE DARREN

Related Searches

temporary structurestage assemblyshipping containerNear North SideChicagoexpress permitevent setup