What was permitted
A significant upgrade to the fire suppression system is underway at 1901 First Avenue in East Harlem (South), Manhattan. This project involves converting the existing sprinkler system into a combined system and replacing the manual fire pump with a new automatic one, which falls under standpipe work.
The permit for this extensive sprinkler work was issued on June 24, 2026, with an estimated project cost of $1,220,000. LEGUCI PIPING&HEATING LLC is the contractor handling this project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 328219491 |
|---|---|
| Work permit # | M00672654-I1-EW-SD |
| Job filing number | — |
| Work type | Sprinklers |
| Status | Permit Issued |
| Job description | Converting the existing system into a combined system. Replacement of existing manual fire pump with new automatic fire pump is standpipe work. Installation of the new sprinkler floor control assemblies and drain riser are sprinkler |
| Floor / unit | Cellar, Floor Number(s) 1 through 18, Roof |
| Estimated cost | $1,220,000 |
| Approved | May 10, 2022 |
| Issued | June 24, 2026 |
| Expires | July 27, 2026 |
| BBL | — |
| BIN | — |