What was permitted
For those interested in building safety upgrades on the Upper West Side, a significant project involving sprinkler and standpipe modifications at 1980 Broadway has been permitted. This work is designed to enhance fire suppression systems without altering the building's use or occupancy.
The permit was issued on May 18, 2026, with a substantial estimated project cost of $495,375. PREFERRED SPKLR AND MECH (F) is the contractor responsible for these extensive system upgrades.