What was permitted
This permit is for sprinkler system work, specifically the installation of new supply water and sanitary drain piping on the 4th floor, connecting to the 3rd floor ceiling. Additionally, twenty-two sprinkler heads will be installed on the fourth floor at 424 Madison Avenue in Manhattan's Midtown-Times Square.
Issued on July 29, 2026, the estimated project cost for this sprinkler installation is $51,000. EL-ROC CONTRACTING OF BK (P) is the plumbing contractor for this project.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 850026469 |
|---|---|
| Work permit # | M01389310-S2-PL |
| Job filing number | — |
| Work type | Sprinklers |
| Status | Permit Issued |
| Job description | PL/SP for INSTALLATION OF NEW SUPPLY WATER AND SANITARY DRAIN PIPING AT 4TH FLOOR, TO BE CONNECTED AT THE 3RD FLOOR CEILING. INSTALLATION OF TWENTY-TWO (22) SPRINKLER HEADS AS SHOWN ON PLAN AT FOURTH FLOOR. NO CHANGE IN EGRESS OR USE OF OCCUPANCY. |
| Floor / unit | Floor Number(s) 004 through 004 |
| Estimated cost | $51,000 |
| Approved | April 29, 2026 |
| Issued | July 29, 2026 |
| Expires | September 10, 2026 |
| BBL | — |
| BIN | — |
Property owner
BLDG Management Co.
Christa Collier