What was permitted
A major structural undertaking is underway in the Soundview-Bruckner neighborhood of the Bronx with the construction of a new six-story school. The building's design incorporates two-way slabs on concrete shear walls and columns for the lower floors, with structural steel used for the upper gymnasium.
This significant construction project received its permit on August 20, 2026, with CKK CONSULTING LLC serving as the general contractor. The project cost is not listed on this permit.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Bronx, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 682471681 |
|---|---|
| Work permit # | X01361959-S3-ST |
| Job filing number | — |
| Work type | Structural |
| Status | Permit Issued |
| Job description | CONSTRUCTION OF A NEW SIX (6) STORY GROUND-UP SCHOOL. THE FIRST 6TH FLOORS ARE TWO-WAY SLABS ON CONCRETE SHEAR WALLS AND COLUMNS, WHILE STRUCTURAL STEEL IS USED ABOVE THE 6TH FLOOR GYMNASIUM. |
| Floor / unit | Floor Number(s)-1-SO-3535-X01361959-I1, Floor Number(s)-1-SO-4271-X01361959-I1, Floor Number(s)-4-SO-8758-X01361959-I1, Floor Number(s)-4-SO-5265-X01361959-I1, Floor Number(s)-1-SO-1454-X01361959-I1, |
| Estimated cost | Not reported |
| Approved | June 25, 2026 |
| Issued | August 20, 2026 |
| Expires | June 7, 2027 |
| BBL | — |
| BIN | — |
Property owner
Na
Chris Karalis