What was permitted
A temporary pipe scaffold is being installed at 15 West 63 Street in the Upper West Side-Lincoln Square neighborhood of Manhattan. This scaffold will extend from the top of a sidewalk shed up to the 5th floor terrace on the west 63rd Street and west elevations.
This permit was issued on April 10, 2026, with an estimated cost of $1,000. SPRING SCAFFOLDING LLC (GC) is the contractor for this installation, which does not involve changes to the building's use, egress, or occupancy.
Plan a similar project
Want work like this done at your place?
Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.
View the official permit record
Tracking number, work description, cost and dates
View the official permit record
Tracking number, work description, cost and dates
| Tracking number | 955039468 |
|---|---|
| Work permit # | M01198813-S1-SF |
| Job filing number | — |
| Work type | Supported Scaffold |
| Status | Permit Issued |
| Job description | INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD AT THE SOUTH (WEST 63RD ST) AND WEST ELEVATIONS FROM THE TOP OF THE SIDEWALK SHED TO PAST THE 5TH FLOOR TERRACE. |
| Floor / unit | Open Space |
| Estimated cost | $1,000 |
| Approved | April 11, 2025 |
| Issued | April 10, 2026 |
| Expires | March 1, 2027 |
| BBL | — |
| BIN | — |
Property owner
Pr
Adrienne Alicea
Related searches