Reported project cost

Not reported

The filer did not disclose a cost on this permit. Suspended Scaffold.

Issued
October 21, 2026
Expires
July 1, 2027
License
Rigger

What was permitted

A suspended scaffold is being installed at 3 Columbus Circle in Manhattan's Midtown-Times Square neighborhood. This work is related to a FISP (Facade Inspection Safety Program) inspection and will utilize industrial rope access techniques.

The permit for this suspended scaffold installation was issued on October 21, 2026. The project cost is not specified in the permit details, and STRUCTUAL PRESV SYSTEM (R) is the contractor.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Manhattan, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number153850950
Work permit #M01457814-I1-SC
Job filing number—
Work typeSuspended Scaffold
StatusPermit Issued
Job descriptionFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Floor / unit—
Estimated costNot reported
ApprovedOctober 20, 2026
IssuedOctober 21, 2026
ExpiresJuly 1, 2027
BBL—
BIN—

Property owner

The Moinian Group

Related searches