Skip to content
Swimming Pool ConstructionSherman Oaks-Studio City-Toluca Lake-Cahuenga PassPermit issued

New Swimming Pool at 13208 W Bloomfield St, Sherman Oaks

13208 W BLOOMFIELD ST, Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass, 91423

Winston

Sinra's conciergeOnline now

Planning swimming pool construction work near Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass? I’ll scope it, price it, and line up the right pro.

Reported project cost

$30,000

As declared on the permit filing. Swimming-Pool/Spa.

Issued
July 2, 2026
Expires
—
License
B

What was permitted

A new swimming pool with an attached spa is being constructed at 13208 W Bloomfield St, serving the Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass area of Los Angeles. The project is proceeding according to engineering specifications.

This permit was issued on July 2, 2026, with an estimated project cost of $30,000. Urban Culture Design & Development is the contractor responsible for this new pool installation.

Plan a similar project

Want work like this done at your place?

Tell us what you have in mind. We scope it, price it against work like this in Sherman Oaks-Studio City-Toluca Lake-Cahuenga Pass, and lines up the right contractor. You approve; we handle the back-and-forth.

View the official permit record

Tracking number, work description, cost and dates

Tracking number25047-20000-00844
Work permit #—
Job filing number—
Work typeSwimming-Pool/Spa
StatusIssued
Job descriptionNEW SWIMMING POOL WITH ATTACHED SPA AS PER ENGINEERING
Floor / unit—
Estimated cost$30,000
ApprovedJuly 3, 2025
IssuedJuly 2, 2026
Expires—
BBL—
BIN—

Related searches

swimming poolspaSherman OaksLos Angelesbuilding permit$30,000new construction